A local steel mill customer needed to replace their existing waste tanks as well as add a containment area for environmental protection. Working closely with the customer, a design was developed and our team began work immediately. To minimize the customer’s downtime during the installation process, all components were prefabricated as much as possible off-site. During the five day installation process, we assembled the containment area and installed two fiberglass tanks and the catwalk.